< software in production />

Case studies

Every case study here is a system running in production, shown with a real screenshot and told the way it happened: the client's context, the problem they brought, what VTA built and with which stack. The interfaces are in Portuguese because the clients are Brazilian; the engineering is the same we ship to clients in the US, Canada and the UK.

Where a client has not authorized a number (revenue, users, hours saved), the number is not on the page. We would rather publish a case study without metrics than one with invented ones. What you will find instead is what the client asked for, what we built and the stack we picked, block by block.

If your project looks like one of these, each page ends with the matching service and a WhatsApp button with the message already written. An engineer replies the same day. If you would rather write first, the contact page has a short form.

Four of these projects are also listed on VTA's Clutch profile.

Questions about the case studies

Why are there no result numbers?

Client numbers only go public with written permission, and we do not have it yet for these five. When we do, a results section goes on the page.

Are the screenshots real?

Yes. They were captured from the production dashboards in August 2026, and Velify's in September. The WR Felix and Velify ones have the financial figures blurred until the client approves the open version.

Can I talk to one of these clients?

It depends on the client. Ask on WhatsApp and we will check with them before sharing any contact.

The next case study could be yours.

Tell us what you need. An engineer replies the same day, and the scope, price and delivery date go into a written proposal before any code is written.